Miami Dossierby Metrik WhatsApp the Desk
Trusted Market Intelligence™

Relocating from Madrid to West Palm Beach: which building fits?

For the Spanish family moving from Madrid to Palm Beach County, buying from abroad in euros, who needs a home on a school calendar and a clear list of what to settle before the first wire.

This page explains. Whether the building suits you is a separate conversation. Contact the desk at Miami Dossier for the current position on any building we cover.

The short answer

If the family needs keys soon, Alba Palm Beach is the one: finished in June 2026, on the Intracoastal, with only the developer's final homes left. If you can wait a school year, South Flagler House is the safest calendar among the new towers, with delivery reported on track for March 2027 and about 80 percent sold. Olara delivers in phases from late 2026 to 2028. Banyan Tree Residences is the longest wait, with no completion date published. None of the four publishes a price, so every comparison starts with a request for the current list.

How do the four buildings compare?

The same five questions, from the developers' published material. No West Palm Beach developer on our file publishes an entry price.

Alba Palm Beach. Price point: no published price; released on request. Delivery: completed June 2026, immediate occupancy. Unit mix: 55 residences, two to four bedrooms plus two and three storey townhomes, 1,778 to more than 4,500 square feet. Position: 4714 N. Flagler Drive, on the Intracoastal, facing Palm Beach Island, with a private dock. Operator: BGI Companies with Blue Road.

South Flagler House. Price point: no published price. Delivery: topped out November 2025; March 2027, reported on track. Unit mix: two towers of 28 storeys; the Park Residences on floors 1 to 3 run one and two bedrooms of about 1,800 to 3,000 square feet; about 80 percent sold. Position: 1355 South Flagler Drive, on 3.4 acres facing the Intracoastal and Palm Beach Island. Operator: Related Ross, with Robert A.M. Stern as architect.

Olara. Price point: no published price. Delivery: phased, late 2026 through 2028; construction at floor 15 in August 2026. Unit mix: 275 residences of two to four bedrooms plus den, 26 storeys, twelve guest suites. Position: 1919 N Flagler Drive, on the Intracoastal, with a private marina. Operator: Savanna, with dining by José Andrés Group and a 24/7 medical concierge by Sollis Health.

Banyan Tree Residences. Price point: no published price. Delivery: pre-construction; no completion date in the filed materials. Unit mix: 88 residences of one to four bedrooms plus a penthouse collection. Position: 400 Hibiscus Street, downtown West Palm Beach, near the Intracoastal. Operator: Banyan Tree, with a 24 hour host team and The Sanctuary Club across more than 100 Banyan Group properties in more than 20 countries.

From the coverageAll buildings ›
Which building fits a school calendar?

Work backward from the first day of school.

Alba is the only one of the four a family can move into now. The trade is choice: the developer's final inventory is very limited, so ask which homes remain before planning around one. See Alba's position on the water.

South Flagler House gives a date in the first half of 2027. A family that rents for the first school year and moves at delivery can plan around it, provided the purchase agreement's outside date is read with counsel. Its amenity list includes a children's playroom, a teen lounge and a sports court. See whether South Flagler House is worth it.

Olara delivers in phases. Ask which phase your home is in, since late 2026 and 2028 are two very different school years. Banyan Tree publishes no date at all.

What is different about buying from Spain?

Several things that are routine in Madrid work differently here.

There is no notary who represents both sides. In Florida, each side has its own advisers, a title company insures the title and handles the closing, and the deed is recorded with the county. A buyer from abroad can usually sign remotely, with documents notarised and apostilled in Spain as the title company requires.

Deposits on a new building are paid in stages and held in escrow, with the balance at closing. The purchase agreement for a developer's home also gives the buyer a 15 day window to cancel after signing or after receiving the required documents, under Florida's condominium statute. Our pages on where your deposit actually sits and the deposit schedule explained cover both.

Money moves in euros and lands in dollars. Every stage carries currency exposure and a source of funds review at the receiving bank. See currency for a European buyer and why international wires get held.

What should you settle before the first wire?

Three questions belong with counsel, not with a sales gallery.

Your right to live here. A purchase gives no right to reside in the United States; that comes through a visa or other status, a separate process. Our page on whether a Miami condo gets you a visa explains why.

Your tax position in both countries. Moving from Spain to Florida changes where you are taxed, and Spain and the United States have their own rules on departure and on property held abroad. Ask a tax adviser in each country before signing. Our page for a Spain resident buying in Miami lists the questions.

How you hold the home. Personal name, a US company or a trust each changes reporting and estate exposure. Decide before signing; see LLC, trust or personal name.

Who each one suits, and what you give up

Alba suits the family that must arrive this year and wants the water and a boat at the door. You give up choice, since only the final homes remain.

South Flagler House suits the family that can rent for a year and wants a Stern building with rooms for children and teenagers. You give up an immediate move and most of the inventory.

Olara suits the family that wants the most staff and services, a marina and a medical concierge. You give up a single date, since delivery runs in phases.

Banyan Tree suits the family that travels and wants a brand with resorts in more than 20 countries. You give up a published completion date.

For a family that chooses on the spa and the gym, read the best new West Palm Beach condos for wellness. For the New York version of this move, read relocating from New York to West Palm Beach; for the waterfront ranking, the best waterfront new condos in West Palm Beach. Our Alba neighbours note maps the four. The desk holds the current lists for all four and reads the purchase agreements with you before the first euro moves; our note on who to call when buying in West Palm Beach explains how.

The Shift

What the desk holds on West Palm Beach

Contact the desk at Miami Dossier for the current plans, pricing and availability as the developer releases them, discussed one to one.

The plans by line, and which lines are left. The developer’s current release, not the brochure’s.
The deposit schedule. Proportions, trigger dates, and where the money sits.
What the sales gallery will not volunteer. The view lines that close, the floors that trade first, the association budget.
Where we would not proceed. Sometimes the answer is a different building. Sometimes it is not yet.

WhatsApp the desk · 305.588.4547·[email protected]

Common Questions

Questions buyers ask

Can a Spanish citizen buy a condo in West Palm Beach?
Yes. Florida does not bar Spanish nationals from buying a condo. A buyer from Spain can sign, wire deposits and close from abroad, with documents notarised and apostilled as the title company asks. Florida also requires a buyer affidavit at closing; ask counsel what it covers.
Which West Palm Beach condo can we move into now?
Alba Palm Beach, completed in June 2026 with immediate occupancy. The developer's remaining inventory is very limited. South Flagler House delivers in March 2027, per the developer, and Olara in phases from late 2026.
Does buying in West Palm Beach give me a US visa?
No. A home purchase gives no right to live in the United States. Residence comes through a visa or other status, a separate process with an immigration attorney.Read the full answer
Is there a notary in a Florida closing?
Not in the Spanish sense. Each side has its own advisers, a title company handles the closing and insures the title, and the deed is recorded with Palm Beach County. Signatures may be notarised, but no single official represents both sides.
How much of the price is paid before a new building is finished?
It varies by building. Deposits are staged across construction milestones and held in escrow, with the balance at closing. Ask each developer for the written schedule before you reserve.
Do West Palm Beach new condos publish their prices?
None of the four on our file publishes an entry price. Pricing is released on request. The desk holds the current lists.
Which West Palm Beach building has the most for children?
South Flagler House lists a children's playroom, a teen lounge and a sports court. Banyan Tree lists a children's discovery garden. Olara has twelve guest suites for visiting family.
Can I cancel a Florida new condo contract?
When buying from a developer, Florida's condominium statute gives a 15 day window to cancel after signing or after receiving the required documents. Read the dates in your agreement with counsel.Read the full answer
Do I pay tax in Spain and the US on a Florida home?
Possibly both, depending on where you are resident and how you hold the home. Florida charges property tax every year. Ask tax advisers in both countries before signing.
When does Olara deliver?
In phases, from late 2026 through 2028, per the developer. Construction had reached floor 15 in August 2026. Ask which phase your home falls in.
The Intelligence Report

Read the market from the inside.

A private report on the Miami market, sent when there is something worth knowing. No noise, no listings, no pressure.

A sense of the standardSee all buildings ›
Before You Act On Any Of This

Before you act on any of this

We hold no listings and we are not the developer. Contact the desk at Miami Dossier and we will tell you what applies to your situation, what does not, and where we would not proceed. Where a question is legal, tax or structuring, we introduce you to advisers who handle that properly rather than answering it ourselves.

WhatsApp the desk · 305.588.4547·[email protected]

Who answers this page

The Miami Dossier team works for the buyer, not the developer. Every agent on Samuel Strauch’s team represents buyers in Miami pre-construction.

A person replies within 24 hours, usually much sooner. On weekends, back on Monday morning.

WhatsApp the deskEmail the desk