Miami Dossierby Metrik WhatsApp the Desk
Trusted Market Intelligence™

The punch list at Edgeworth: how to inspect a new residence, what to write down, and how it gets fixed

A new residence is finished when the punch list is, not when the keys are handed over. At Edgeworth, here is how to walk it and what to write.

This page is a framework. Whether the building suits you is a separate conversation. Contact the desk at Miami Dossier for the current position on any building we cover.

Who Walks It

You, the desk, and an inspector.

The developer’s closing agent walks you through; the desk walks with a checklist against the specification; for a large residence an independent inspector is worth the fee, because a new building is not a defect-free building. Allow two hours, in daylight, with the water and power on.

Edgeworth: The homes are as the dossier records.

Read it against the Kempinski Residences Miami Design District dossier for the nearest comparison.

What To Test

Room by room.

Every window and terrace door for seal and swing. Every outlet and switch. Water pressure and hot water at every tap; drains; the dishwasher and washer on a cycle. Air conditioning under load for twenty minutes, and the thermostat zones. Finishes under raking light: stone, millwork, paint, grout. Appliances by model against the specification. Photograph everything you write down.

Edgeworth: As the dossier records.

From the coverageAll buildings ›
The List Itself

Written, signed, dated.

Each item with a location, a description and a photograph; the developer’s representative signs it with a cure period, often thirty to sixty days. Where the contract allows, an escrow holdback for unfinished items is the buyer’s leverage; most Florida pre-construction contracts do not allow one, so the signature and the warranty are the leverage instead.

After Closing

Warranties and the second list.

Florida gives statutory warranties on a new condominium from the developer for set periods; the association pursues building-wide items after turnover. Keep a second list for what appears in the first months, and send it in writing before the periods run.

Write it down, photograph it, get a signature. Memory is not a punch list.

Sources

What this note rests on.

Developer materials for Edgeworth as carried on the live dossier, verified September 2026. Compiled by the desk at Miami Dossier; figures are approximate and the developer’s.

The Shift

What the desk holds on Edgeworth

Contact the desk at Miami Dossier for the documents behind this note, read one to one with you and your advisers.

The plans by line, and which lines are left. The developer’s current release, not the brochure’s.
The deposit schedule. Proportions, trigger dates, and where the money sits.
What the sales gallery will not volunteer. The view lines that close, the floors that trade first, the association budget.
Where we would not proceed. Sometimes the answer is a different building. Sometimes it is not yet.

WhatsApp the desk · 305.588.4547·[email protected]

Common Questions

What the buyer at delivery asks

Can I refuse to close at Edgeworth over punch-list items?
Rarely; most contracts require closing on the date with the list cured afterwards. The signed list and the warranties are the enforcement.
Should I hire an inspector for a new residence?
For a large residence, yes; new is not defect-free, and an inspector finds what a walkthrough misses.
How long does the developer have to fix punch-list items?
The cure period on the signed list, often thirty to sixty days; statutory warranties cover what appears later.
Who is the developer of Edgeworth?
Related Ross; the developer behind South Flagler House and the West Palm Beach waterfront portfolio.
Where is Edgeworth?
1155 S Flagler Dr, West Palm Beach, FL 33401, on the South Flagler Drive waterfront.
How many residences does Edgeworth have?
Bedroom mix and size ranges not published in the intake materials.
What is the entry price at Edgeworth?
The developer’s current pricing is held by the desk; current pricing and availability are discussed one to one.
How do I get the plans and the price list for Edgeworth?
Through the desk, sent privately within 24 hours, usually much sooner.
Does Miami Dossier represent the developer of Edgeworth?
No. Miami Dossier represents the buyer and is not the developer.
Can I visit Edgeworth with the desk?
Yes. The desk arranges the visit and registers your representation with the developer first.
The Intelligence Report

Read the market from the inside.

A private report on the Miami market, sent when there is something worth knowing. No noise, no listings, no pressure.

A sense of the standardSee all buildings ›
Before You Act On Any Of This

Before you act on any of this

We hold no listings and we are not the developer. Contact the desk at Miami Dossier and we will tell you what applies to your situation, what does not, and where we would not proceed. On this topic that means the document before the opinion. Where a question is legal, tax or structuring, we introduce you to advisers who handle that properly rather than answering it ourselves.

WhatsApp the desk · 305.588.4547·[email protected]

Who answers this page

The Miami Dossier team works for the buyer, not the developer. Every agent on Samuel Strauch’s team represents buyers in Miami pre-construction.

A person replies within 24 hours, usually much sooner. On weekends, back on Monday morning.

WhatsApp the deskEmail the desk