The sixty days before keys at Alba Palm Beach: the closing wire, the walkthrough, utilities, and what to book early

The closing notice gives you a date. The sixty days before it are a list. At Alba Palm Beach, here is the list in the order it falls due.

This page is a framework. Whether the building suits you is a separate conversation. Contact the desk at Miami Dossier for the current position on any building we cover.

Days 60 To 30

Money and paper.

Confirm the final balance against the contract and the deposits already paid. Open or fund the account the wire will leave from, in dollars, with the bank briefed that a large wire is coming. Instruct counsel on the form of title and the closing documents. For a buyer abroad: notarizations for documents signed outside the United States take weeks; start now.

Alba Palm Beach: The deposit schedule is held by the desk and read with you before contract.

Read it against the Kempinski Residences Miami Design District dossier for the nearest comparison.

Days 30 To 10

Insurance, utilities, the building.

Bind the HO-6 policy to start on the recording date; the lender wants proof before funding and a cash buyer should want it for the same reason. Open accounts for electricity, water where separately metered, and internet; some buildings carry a building-wide provider, ask which. Register with the association: the move-in packet, the elevator booking, the staff and vehicle credentials, the rules you agreed to in the declaration.

Alba Palm Beach: Sunrise pool overlooking the Intracoastal plus a sunset pool; luxury spa with sauna, steam and treatment room; Technogym fitness with yoga and Pilates; screening room; private dining room with climate-controlled wine storage and catering kitchen; owners’ great room, library and lounge; bocce court and lawn chess; pet spa; private dock with boat-slip access for owners; EV-ready covered garage; summer kitchens on all terraces.

From the coverageAll buildings ›
Days 10 To 1

The walkthrough and the wire.

Walk the residence with the desk and a checklist against the specification: finishes, appliances, glass, terrace doors, every outlet, water pressure, the air conditioning under load. Everything unfinished goes on a punch list the developer signs with a date to cure. Verify the wire instructions by telephone to a number you already have, never to one in an email; wire fraud at closing is the most common theft in Florida real estate.

Alba Palm Beach: The homes are as the dossier records.

The Day

What to carry.

Identification for every signer, the wire confirmation, the insurance binder, the signed punch list, and the contact for the building’s manager. Keys, fobs and the parking credential come from the developer’s closing agent; the first visit to the manager’s office fixes the rest.

Nothing on this list is hard. All of it is late if it starts on day nine.

Sources

What this note rests on.

Developer materials for Alba Palm Beach as carried on the live dossier, verified September 2026. Compiled by the desk at Miami Dossier; figures are approximate and the developer’s.

The Shift

What the desk holds on Alba Palm Beach

Contact the desk at Miami Dossier for the documents behind this note, read one to one with you and your advisers.

The plans by line, and which lines are left. The developer’s current release, not the brochure’s.
The deposit schedule. Proportions, trigger dates, and where the money sits.
What the sales gallery will not volunteer. The view lines that close, the floors that trade first, the association budget.
Where we would not proceed. Sometimes the answer is a different building. Sometimes it is not yet.

WhatsApp the desk · 305.588.4547·[email protected]

Common Questions

What the buyer preparing for delivery asks

When will I know my exact closing date at Alba Palm Beach?
With the closing notice, usually thirty to sixty days ahead, once the building has its certificate of occupancy; the contract sets the notice period.
How do I protect the closing wire?
Verify instructions by telephone to a number you already hold, never from an email; send a small test wire first if the title company allows it.
What happens to items unfinished at the walkthrough?
They go on a punch list the developer signs with a cure date; closing usually proceeds, and the list is enforced afterwards.
Who is the developer of Alba Palm Beach?
BGI Companies (developer) with Blue Road (co-developer).
Where is Alba Palm Beach?
4714 N. Flagler Drive, West Palm Beach, FL 33407; west bank of the Intracoastal Waterway, no fixed bridges to the Atlantic, direct east views of Palm Beach Island.
How many residences does Alba Palm Beach have?
55 residences: two-, three- and four-bedroom condominiums plus two- and three-storey townhomes, 1,778 to more than 4,500 square feet; limited residences per floor, private elevators and vestibules, private gated entry.
Who designed Alba Palm Beach?
Spina O’Rourke + Partners (architecture and interior design); Schmidt Nichols (landscape architect).
What amenities does Alba Palm Beach have?
Sunrise pool overlooking the Intracoastal plus a sunset pool; luxury spa with sauna, steam and treatment room; Technogym fitness with yoga and Pilates; screening room; private dining room with climate-controlled wine storage and catering kitchen; owners’ great room, library and lounge; bocce court and lawn chess; pet spa; private dock with boat-slip access for owners; EV-ready covered garage; summer kitchens on all terraces.
What is the entry price at Alba Palm Beach?
The developer’s current pricing is held by the desk; current pricing and availability are discussed one to one.
How do I get the plans and the price list for Alba Palm Beach?
Through the desk, sent privately within 24 hours, usually much sooner.
The Intelligence Report

Read the market from the inside.

A private report on the Miami market, sent when there is something worth knowing. No noise, no listings, no pressure.

A sense of the standardSee all buildings ›
Before You Act On Any Of This

Before you act on any of this

We hold no listings and we are not the developer. Contact the desk at Miami Dossier and we will tell you what applies to your situation, what does not, and where we would not proceed. On this topic that means the document before the opinion. Where a question is legal, tax or structuring, we introduce you to advisers who handle that properly rather than answering it ourselves.

WhatsApp the desk · 305.588.4547·[email protected]

Who answers this page

Samuel Strauch is the owner of Metrik Real Estate. His team of agents represents buyers in Miami pre-construction.

A person replies within 24 hours, usually much sooner. On weekends, back on Monday morning.

WhatsApp the deskEmail the desk