How do you furnish a new Miami condo before you move in?

For the buyer who has ordered the furniture eight months out, has a designer waiting on a measurement, and has just been told the building's date has moved.

This page explains. Whether the building suits you is a separate conversation. Contact the desk at Miami Dossier for the current position on any building we cover.

The short answer

After closing, with the measuring done before it by permission and the furniture stored until the building lets it in. A buyer of a new condominium does not own the home until the deed records, so the designer's site visit before closing happens only when the developer allows it, usually at the pre-closing walk-through, and nothing is installed before the keys. Between the day the furniture arrives and the day the elevator is booked, the pieces live in off-site storage, bonded if they came through customs, and insured by the buyer. The building then governs the installation: a move-in deposit, a freight elevator reservation, certificates of insurance from every installer, hours, and floor and wall protection. The developers on our file who sell furnished lines, Waldorf Astoria's junior suites, Delano's select lines and NoMad's every residence, are selling the calendar as much as the furniture.

When can a designer measure, and when can furniture go in?

Measuring is a request; installing is a right that begins at closing. Before the deed records the home is the developer's, and access is granted on the developer's terms: a buyer asks the sales team whether a designer may attend the pre-closing walk-through with a tape, whether the developer's own plans with dimensions can be released earlier, and whether a model residence of the same line can be measured instead. The plans are approximate until the walls stand, so a designer who orders from the floor plan orders to a tolerance and confirms at the walk-through. After closing, the furniture enters when the building's rules allow it, not when the truck arrives, which is why the elevator booking is made the day the closing date is fixed. Read how to read a Miami floor plan, interior against total square footage and finishes and customisation at Waldorf Astoria.

From the coverageAll buildings ›
What happens when the date moves?

The furniture waits and the buyer pays for the wait. Delivery dates at new buildings move, the contract's outside date is the only one that binds, and a sofa ordered to a brochure month arrives to a storage bill. A buyer who orders long lead pieces reads the contract's delivery clause first, asks the designer to stage orders against the certificate of occupancy rather than the projected month, and books storage for a term that can be extended. The other direction happens too: a building that finishes early calls the buyer to close, and a buyer whose furniture is still being made closes into an empty home or asks for time. Read delivery timelines and how they slip, which dates in a Miami pre-construction contract can you not miss and can you get more time to close on a new Miami condo.

What about pieces bought abroad?

They clear customs on their own calendar. Furniture, art and fixtures imported for a Miami home arrive through a customs broker, carry duty at the rate their classification sets, and need a consignee with a US address and a place to go, which before closing is not the home. A buyer shipping a container from Europe or Latin America books bonded or off-site storage in South Florida for the gap, insures the goods in transit and in storage under a policy the storage company does not provide, and asks the building two questions in advance: whether a container may be unloaded at the loading dock or must be broken down off site, and whether the freight elevator takes the longest piece. The building's deliveries rules answer the second; the first is answered by the dock and the street. Read how deliveries and packages work at a Design District or Wynwood condo, deliveries and arrivals at Olara and owning a Miami condo from abroad.

What does the building require of the installers?

The same four things of every trade. A move-in or installation deposit, held against damage and returned after an inspection; a reservation of the freight elevator for a window on a weekday, with pads up and a porter present; a certificate of insurance from each installer naming the association, with the limits the rules set; and the protection of floors, walls and the corridor from the dock to the door. Hours are set by the rules, and a building with a hotel in it sets them around the hotel's own deliveries. An installation that moves a wall, a floor or a fixture is a renovation, not furnishing, and goes to the board for approval first. Damage to the common areas is charged to the owner and recovered from the installer's insurer, which is why the certificate matters more than the quote. Read what a new Miami condo requires before you can move in, moving in and renovations at Delano and moving in and renovations at Kempinski.

Is a furnished line the answer?

For the buyer who wants the calendar solved, sometimes. Waldorf Astoria Residences Miami publishes furnished junior suites among its lines; Delano Residences publishes furnished suites in select lines and ~421 fully finished residences; NoMad Residences Wynwood publishes every residence fully furnished and curated by DesignAgency, in a building that opened in May 2026. A furnished line removes the storage, the customs and the elevator weeks, and replaces them with the developer's choices and a specification the buyer reads as carefully as a floor plan: what is included, what is a rendering, and what the warranty covers when a chair, rather than a wall, fails. The buyer who wants their own pieces reads the furnished line as a benchmark for what a finished home costs in time, and plans the gap. Read furnished or unfurnished: which new Miami condo, floor plans and unit mix at Delano and the NoMad Residences buyer's guide. The desk reads the delivery clause, the deliveries rules and the furnished specification with the buyer before the reservation, and the first year of owning a Miami condo picks up where the elevator pads come down.

The Shift

What the desk holds on Miami

Contact the desk at Miami Dossier for the current plans, pricing and availability as the developer releases them, discussed one to one.

The plans by line, and which lines are left. The developer’s current release, not the brochure’s.
The deposit schedule. Proportions, trigger dates, and where the money sits.
What the sales gallery will not volunteer. The view lines that close, the floors that trade first, the association budget.
Where we would not proceed. Sometimes the answer is a different building. Sometimes it is not yet.

WhatsApp the desk · 305.588.4547·[email protected]

Common Questions

Questions buyers ask

Can I furnish my new condo before closing?
No. The home is the developer's until the deed records. A designer may measure before closing only with the developer's permission, usually at the pre-closing walk-through, and nothing is installed before the keys.
Can my designer measure the unit before closing?
By request to the sales team, usually at the walk-through or at a model of the same line. The developer's plans are approximate until the walls stand, so orders are placed to a tolerance.
What if the building is late and my furniture arrives?
It goes to off-site storage at the buyer's cost until the elevator can be booked. The contract's outside date is the only date that binds; orders are staged against the certificate of occupancy, not the brochure month.
Do I pay customs duty on furniture shipped to Miami?
Imported furniture clears through a customs broker and carries duty at the rate its classification sets. A consignee with a US address and a storage destination are needed before the shipment lands.
Does the building need insurance from my installer?
Yes. The rules require a certificate of insurance from each installer naming the association, with set limits, plus a deposit, an elevator reservation and floor and wall protection.
Can I book the freight elevator before closing?
Usually only once the closing date is fixed, and for a weekday window. A building with a hotel sets installation hours around the hotel's own deliveries.
Is hanging art or installing a closet a renovation?
Anything that alters a wall, a floor or a fixture goes to the board as a renovation. Freestanding furniture and art hung on existing walls are usually furnishing, within the rules' hours.
Which new Miami condos come furnished?
Waldorf Astoria publishes furnished junior suites; Delano publishes furnished suites in select lines; NoMad Residences Wynwood publishes every residence fully furnished and curated.
Who pays if the movers damage the corridor?
The owner, under the rules, with recovery from the installer's insurer under the certificate the building required. The move-in deposit is held against it.
Who should I call about furnishing a new Miami condo?
The sales team for the walk-through and the plans, the association's rules for the installation requirements, a customs broker for pieces from abroad, and the desk to read the delivery clause and the deliveries rules with you before the reservation.
The Intelligence Report

Read the market from the inside.

A private report on the Miami market, sent when there is something worth knowing. No noise, no listings, no pressure.

A sense of the standardSee all buildings ›
Before You Act On Any Of This

Before you act on any of this

We hold no listings and we are not the developer. Contact the desk at Miami Dossier and we will tell you what applies to your situation, what does not, and where we would not proceed. Where a question is legal, tax or structuring, we introduce you to advisers who handle that properly rather than answering it ourselves.

WhatsApp the desk · 305.588.4547·[email protected]

Who answers this page

Metrik Real Estate is a Miami real estate company built around one idea: the buyer gets their own team. Miami Dossier is its private buyer advisory for new construction.

A person replies within 24 hours, usually much sooner. On weekends, back on Monday morning.

WhatsApp the deskEmail the desk