Miami Dossierby Metrik WhatsApp the Desk
Trusted Market Intelligence™

Does Olara approve buyers and tenants? Screening and first refusal

Whether Olara approves buyers and tenants is set by its declaration, not by the sales team. Many Florida condominiums require approval of later sales and of leases, some keep a right of first refusal, and the developer’s own sales are usually exempt. Here is what each provision means, and what it changes about renting or reselling later.

This page is a framework. Whether the building suits you is a separate conversation. Contact the desk at Miami Dossier for the current position on any building we cover.

Why A Building Screens

Control over who lives there.

A Florida condominium can require its association to approve a sale, a lease or a long stay, if the declaration says so. The purpose is control. Owners in a small or very private building often want a say in who joins them; a building with an active rental market may want to know who sleeps in it. Two towers on the same street can differ completely.

The size of the community the board screens for: 275 residences of two to four bedrooms plus den across 26 storeys; construction at floor 15 as of August 2026; phased delivery late 2026 through 2028. Who runs the front desk that keeps the list: No brand or operator is recorded for this building.

Read it against the Kempinski Residences Miami Design District dossier for the nearest comparison.

Buying From The Developer, Buying Later

The first buyer and the next one.

The developer’s own sales are usually exempt from approval and from any right of first refusal, so a buyer of a new home at Olara is rarely screened by the association on the first day. The provisions bite later: on whoever buys from you, on your tenants, and sometimes on your heirs or on the company you hold the home through. A buyer taking title in an entity should ask whether the association will want to approve the people behind it, and whether a change in who owns the entity counts as a transfer.

The developer whose documents set these terms: Savanna, New York based real estate investment manager formed in 1992; construction by SavCon and Gilbane; exclusive sales and marketing by Compass Development Marketing Group.

From the coverageAll buildings ›
First Refusal

The association’s option to step into a sale.

A right of first refusal lets the association, or a buyer it names, take over a sale or a lease on the same terms the owner agreed with someone else. It is rarely used, but it adds days to every resale. Read how many days the association has to decide, whether the right covers leases as well as sales, and which transfers are exempt: gifts within a family, a move into a trust, a lender taking the home after foreclosure.

What a later buyer of a home at Olara will be screened into: Two assigned full sized parking spaces with EV capability per residence; twelve guest suites in the building. Where it stands: 1919 N Flagler Drive, West Palm Beach, overlooking the Intracoastal Waterway; Currie Park and the NORA District walkable per the developer; Worth Avenue on Palm Beach island minutes away.

The Application, The Fee, The Clock

And what a refusal triggers.

An approval usually means an application, a background check, sometimes an interview, and a fee. Florida law limits that fee and allows it only where the documents require approval. Ask how long the association has to answer, whether silence counts as approval, and what happens on a refusal: some declarations oblige the association to buy the home or produce another buyer on the same terms, others do not. For leases, ask the minimum term and how often a home may be leased in a year, and note that Florida law limits how far a later amendment restricting leasing reaches owners who bought before it. The shared spaces every approved resident uses: Over 80,000 square feet centred on a private sixth floor deck; dining by Jose Andres Group including an 8,500 square foot indoor and outdoor waterfront restaurant and a dockside oyster bar; private marina with resident slips, a captained fishing boat and a cruising yacht; 24 hour doorman, valet and security; resident manager and concierge. The desk reads the transfer and leasing articles of the declaration for Olara with you and your counsel before contract.

A building that screens its owners protects you, and screens your buyer too. Read both sides.

Sources

What this note rests on.

Developer materials for Olara as carried on the live dossier, verified September 2026. Compiled by the desk at Miami Dossier; figures are approximate and the developer’s.

The Shift

What the desk holds on Olara

Contact the desk at Miami Dossier for the documents behind this note, read one to one with you and your advisers.

The plans by line, and which lines are left. The developer’s current release, not the brochure’s.
The deposit schedule. Proportions, trigger dates, and where the money sits.
What the sales gallery will not volunteer. The view lines that close, the floors that trade first, the association budget.
Where we would not proceed. Sometimes the answer is a different building. Sometimes it is not yet.

WhatsApp the desk · 305.588.4547·[email protected]

Common Questions

What the buyer who may rent the home later asks

Does the association at Olara have to approve buyers?
Only if the declaration requires it. Many Florida condominiums require approval of later sales and leases, while the developer’s own sales are usually exempt; the declaration for Olara states which applies.
What is a right of first refusal in a Florida condominium?
A provision that lets the association, or a buyer it names, take a sale or lease on the terms the owner already agreed. The declaration sets the days allowed and the transfers exempted.
Can a condominium association refuse a tenant?
Where the declaration requires lease approval, the association reviews the tenant and may refuse on the grounds the documents and the law allow; the declaration also sets the minimum lease term and how often a home may be leased.
Who is the developer of Olara?
Savanna, New York based real estate investment manager formed in 1992; construction by SavCon and Gilbane; exclusive sales and marketing by Compass Development Marketing Group.
Where is Olara?
1919 N Flagler Drive, West Palm Beach, overlooking the Intracoastal Waterway; Currie Park and the NORA District walkable per the developer; Worth Avenue on Palm Beach island minutes away.
How many residences does Olara have?
275 residences of two to four bedrooms plus den across 26 storeys; construction at floor 15 as of August 2026; phased delivery late 2026 through 2028.
Who designed Olara?
Arquitectonica; landscape by EDSA, as published in the developer’s own materials and carried on the dossier.
What amenities does Olara have?
Over 80,000 square feet centred on a private sixth floor deck; dining by Jose Andres Group including an 8,500 square foot indoor and outdoor waterfront restaurant and a dockside oyster bar; private marina with resident slips, a captained fishing boat and a cruising yacht; 24 hour doorman, valet and security; resident manager and concierge.
What is the entry price at Olara?
The developer’s current pricing is held by the desk; current pricing and availability are discussed one to one.
How do I get the plans and the price list for Olara?
Through the desk, sent privately within 24 hours, usually much sooner.
The Intelligence Report

Read the market from the inside.

A private report on the Miami market, sent when there is something worth knowing. No noise, no listings, no pressure.

A sense of the standardSee all buildings ›
Before You Act On Any Of This

Before you act on any of this

We hold no listings and we are not the developer. Contact the desk at Miami Dossier and we will tell you what applies to your situation, what does not, and where we would not proceed. On this topic that means the document before the opinion. Where a question is legal, tax or structuring, we introduce you to advisers who handle that properly rather than answering it ourselves.

WhatsApp the desk · 305.588.4547·[email protected]

Who answers this page

The Miami Dossier team works for the buyer, not the developer. Every agent on Samuel Strauch’s team represents buyers in Miami pre-construction.

A person replies within 24 hours, usually much sooner. On weekends, back on Monday morning.

WhatsApp the deskEmail the desk