Miami Dossierby Metrik WhatsApp the Desk
Trusted Market Intelligence™

The developer’s warranty at Edgeworth: what Florida implies, for how long, and how a claim is made

A new building comes with promises the brochure never prints, because the statute prints them. At Edgeworth, here is what they cover, how long they last, and who enforces them.

This page is a framework. Whether the building suits you is a separate conversation. Contact the desk at Miami Dossier for the current position on any building we cover.

What The Law Implies

Fitness, by statute.

Florida’s condominium statute deems the developer to warrant that a new building is fit and merchantable for its intended use. For each residence at Edgeworth, the warranty runs three years from completion of the building. For the roof, the structure and the main mechanical, electrical and plumbing elements, it runs three years from completion or one year after owners take control of the association, whichever is later, up to five years. Contractors and suppliers give implied warranties of their own; appliances follow the manufacturer’s.

Edgeworth: Related Ross; the developer behind South Flagler House and the West Palm Beach waterfront portfolio.

Read it against the Kempinski Residences Miami Design District dossier for the nearest comparison.

What The Contract Adds

Or tries to narrow.

Purchase agreements often add a written limited warranty, a claims procedure, and exclusions such as hairline cracks in stone, normal wear and owner alterations. Some limit remedies or require arbitration. How the contract at Edgeworth sits beside the statute is a question for counsel before signing, not after a leak.

Edgeworth: Bedroom mix and size ranges not published in the intake materials.

From the coverageAll buildings ›
Who Makes The Claim

Owner or association.

A defect inside one residence is the owner’s claim. A defect in the roof, the facade, the garage or the shared systems at Edgeworth belongs to the association, which the developer controls until turnover; that is why the period runs past it. At turnover the developer hands over plans, warranties and records, and many owner boards hire an engineer to review the building before the periods run out.

Edgeworth: The homes are as the dossier records.

Before Any Lawsuit

Notice first.

Florida requires written notice of a construction defect claim to the developer and the contractors before suit, with time to inspect and to offer a repair or a payment. Outer time limits on defect claims have been shortened in recent years, so the dates matter. Keep the closing, certificate of occupancy and turnover dates for Edgeworth in one file. The desk keeps them for every building it covers and introduces counsel when a claim is in view.

The warranty starts with the building, not the closing. Write the dates down.

Sources

What this note rests on.

Developer materials for Edgeworth as carried on the live dossier, verified September 2026. Compiled by the desk at Miami Dossier; figures are approximate and the developer’s.

The Shift

What the desk holds on Edgeworth

Contact the desk at Miami Dossier for the documents behind this note, read one to one with you and your advisers.

The plans by line, and which lines are left. The developer’s current release, not the brochure’s.
The deposit schedule. Proportions, trigger dates, and where the money sits.
What the sales gallery will not volunteer. The view lines that close, the floors that trade first, the association budget.
Where we would not proceed. Sometimes the answer is a different building. Sometimes it is not yet.

WhatsApp the desk · 305.588.4547·[email protected]

Common Questions

What the buyer’s counsel asks

How long does the developer’s warranty last at Edgeworth?
Under Florida’s condominium statute, three years from completion of the building for each residence; for the roof, structure and building systems, three years or one year after turnover, whichever is later, up to five years. Counsel confirms the dates.
Can the contract at Edgeworth limit the warranty?
Contracts often add a written warranty with exclusions and a claims procedure; how it sits beside the statutory warranties is a question for counsel before signing.
Who claims for a leak in the facade?
The association, because the facade is a common element; a defect inside one residence is that owner’s claim.
Who is the developer of Edgeworth?
Related Ross; the developer behind South Flagler House and the West Palm Beach waterfront portfolio.
Where is Edgeworth?
1155 S Flagler Dr, West Palm Beach, FL 33401, on the South Flagler Drive waterfront.
How many residences does Edgeworth have?
Bedroom mix and size ranges not published in the intake materials.
What is the entry price at Edgeworth?
The developer’s current pricing is held by the desk; current pricing and availability are discussed one to one.
How do I get the plans and the price list for Edgeworth?
Through the desk, sent privately within 24 hours, usually much sooner.
Does Miami Dossier represent the developer of Edgeworth?
No. Miami Dossier represents the buyer and is not the developer.
Can I visit Edgeworth with the desk?
Yes. The desk arranges the visit and registers your representation with the developer first.
The Intelligence Report

Read the market from the inside.

A private report on the Miami market, sent when there is something worth knowing. No noise, no listings, no pressure.

A sense of the standardSee all buildings ›
Before You Act On Any Of This

Before you act on any of this

We hold no listings and we are not the developer. Contact the desk at Miami Dossier and we will tell you what applies to your situation, what does not, and where we would not proceed. On this topic that means the document before the opinion. Where a question is legal, tax or structuring, we introduce you to advisers who handle that properly rather than answering it ourselves.

WhatsApp the desk · 305.588.4547·[email protected]

Who answers this page

The Miami Dossier team works for the buyer, not the developer. Every agent on Samuel Strauch’s team represents buyers in Miami pre-construction.

A person replies within 24 hours, usually much sooner. On weekends, back on Monday morning.

WhatsApp the deskEmail the desk