Miami Dossierby Metrik WhatsApp the Desk
Trusted Market Intelligence™

How far along is Bentley Residences? Construction progress, milestones and the deposits

Where Bentley Residences stands today is a fact you can check without asking the sales team: the county’s permit record, the site itself and the construction lender’s inspections all say how far a tower has risen. Progress runs in stages, from the permit through the foundation, the structure, topping off, the facade and the certificate of occupancy, and the deposit schedule is written around those same stages. Here is how to read where Bentley Residences is, and what that means for a buyer deciding whether to sign now or wait.

This page is a framework. Whether the building suits you is a separate conversation. Contact the desk at Miami Dossier for the current position on any building we cover.

The Stages A Tower Passes Through

From the sales gallery to the keys, in the order it actually happens.

A Miami condominium is sold before it exists, and the gap between the launch and the keys is the whole subject of this page. In order: the reservation, then the contract once the condominium documents are filed with the state; the building permit and the construction loan, which in most projects wait for a sales threshold the lender sets; the foundation, piles driven deep and a mat poured over weeks; the structure; topping off, when the last slab is poured; the facade and the interiors, which take longer than buyers expect; and the certificate of occupancy, after which closings begin. Ask which of these Bentley Residences has passed and on what date. The tower as planned: ~216 oceanfront residences across 63 stories. The architect whose drawings the permit was issued on: Bentley Motors, interior and exterior design · Sieger Suarez Architects.

The Bentley Residences dossier holds the developer’s published record. Read it against the Kempinski Residences Miami Design District dossier for the nearest comparison.

How To Verify It Yourself

The permit record, the site, the lender and the photographs.

Progress is public. Miami-Dade County, Palm Beach County and the cities each keep a permit portal where the master building permit and its inspections can be read by anyone with the address; a permit not yet issued means a tower not yet started, whatever the renderings say. The site can be driven past, and a crane, a pile driver or a topped-off structure tells you more than a film. Ask the developer of Bentley Residences for the construction lender’s name and whether the loan has closed, because a lender’s draw inspections are the most disciplined record of progress there is, and ask for dated photographs rather than renderings; read any update for dates and floor numbers, not adjectives. Where the site is: The position is as the dossier records. Who is building it, and on whose paper: Dezer Development.

From the coverageAll buildings ›
The Deposits Follow The Milestones

Why the money moves when the building does, and what to check before each payment.

The deposit schedule for a new condominium is usually written around construction milestones: a payment at contract, another at groundbreaking or at the permit, another at topping off, the balance at closing. That is not an accident; it ties your money to the developer’s progress and gives you a date to verify before each wire. Before a milestone payment, confirm the milestone happened: the permit record for the groundbreaking, the site for the top-off. Florida law governs how a developer may hold and use deposits on a pre-construction condominium, and the contract names the escrow agent who holds yours; read both with counsel, and ask what happens to each payment if a milestone is missed. The schedule for Bentley Residences as published or held: The deposit schedule is held by the desk and read with you before contract. What you are paying for, as described: Private 3 or 4 car garages, private heated pools with raised sundecks, summer kitchens with Gaggenau, 10 foot ceilings, sauna in the primary bath.

What Progress Tells You, And The Trade-off

The date it supports, the date it does not, and signing early against signing late.

Progress tells you where the building is; it does not tell you when it will finish, and nobody honest will give you that date as a promise. The contract carries an estimated completion date and an outside date, and the gap between them is the developer’s cushion; what progress adds is evidence. A topped-off tower is nearer its keys than a fenced lot, and a buyer who checks the record each quarter knows which Bentley Residences is. The operator who will run the building once it opens, where there is one: No brand or operator is recorded for this building. What the finished building is meant to hold: Over ~20,000 SF across three levels furnished by Bentley Home: a three story lobby with ocean views, lobby restaurant under 33 foot glass, whiskey bar, 16 seat private dining room, 14 seat theatre, cigar lounge, spa and pet spa, beauty salon, simulator game room, oceanfront pool and 10 cabanas.

The trade-off is choice against certainty. Signing early at Bentley Residences means the widest choice of line and floor and the longest wait, with the deposits out and the finish unseen; signing late means a building you can stand in and whatever remains on the price list. The desk reads the permit record, the lender’s status and the deposit schedule for Bentley Residences with you before either decision.

A rendering is a promise. A permit is a fact. Pay on the fact.

Sources

What this note rests on.

Developer materials for Bentley Residences as carried on the live dossier, verified 2026-09-19. Compiled by the desk at Miami Dossier; figures are approximate and the developer’s.

The Shift

What the desk holds on Bentley Residences

Contact the desk at Miami Dossier for the documents behind this note, read one to one with you and your advisers.

The plans by line, and which lines are left. The developer’s current release, not the brochure’s.
The deposit schedule. Proportions, trigger dates, and where the money sits.
What the sales gallery will not volunteer. The view lines that close, the floors that trade first, the association budget.
Where we would not proceed. Sometimes the answer is a different building. Sometimes it is not yet.

WhatsApp the desk · 305.588.4547·[email protected]

Common Questions

What the buyer deciding whether to sign now or wait for the tower to rise asks

How far along is construction at Bentley Residences?
Check it yourself: the county’s permit portal shows whether the master permit is issued and inspected, and the site shows a pile driver, a rising structure or a topped-off tower. Ask the developer for dated photographs and the lender’s status. The desk holds the current record for Bentley Residences.
When will Bentley Residences be finished?
The contract gives an estimated completion date and an outside date; progress tells you where the building is between them, not when it will finish. A topped-off tower is nearer its keys than a fenced lot. Read both dates with counsel and verify the stage before each deposit.
Can you check construction progress at Bentley Residences without asking the sales team?
Yes. The permit portals of Miami-Dade and Palm Beach counties and the cities are public and searchable by address; the site can be driven past; and the construction lender’s draw inspections are the most disciplined record, which the developer can be asked to confirm. Dated photographs beat renderings.Read the full answer
Who is the developer of Bentley Residences?
Dezer Development, as published in the developer’s own materials and carried on the dossier.
How many residences does Bentley Residences have?
~216 oceanfront residences across 63 stories.
Who designed Bentley Residences?
Bentley Motors, interior and exterior design · Sieger Suarez Architects.
What amenities does Bentley Residences have?
Over ~20,000 SF across three levels furnished by Bentley Home: a three story lobby with ocean views, lobby restaurant under 33 foot glass, whiskey bar, 16 seat private dining room, 14 seat theatre, cigar lounge, spa and pet spa, beauty salon, simulator game room, oceanfront pool and 10 cabanas.
What is the entry price at Bentley Residences?
From $5,800,000 as published by the developer; current pricing and availability are discussed one to one.
How do I get the plans and the price list for Bentley Residences?
Through the desk, sent privately within 24 hours, usually much sooner.
Does Miami Dossier represent the developer of Bentley Residences?
No. Miami Dossier represents the buyer and is not the developer.
The Intelligence Report

Read the market from the inside.

A private report on the Miami market, sent when there is something worth knowing. No noise, no listings, no pressure.

A sense of the standardSee all buildings ›
Before You Act On Any Of This

Before you act on any of this

We hold no listings and we are not the developer. Contact the desk at Miami Dossier and we will tell you what applies to your situation, what does not, and where we would not proceed. On this topic that means the document before the opinion. Where a question is legal, tax or structuring, we introduce you to advisers who handle that properly rather than answering it ourselves.

WhatsApp the desk · 305.588.4547·[email protected]

Who answers this page

The Miami Dossier team works for the buyer, not the developer. Every agent on Samuel Strauch’s team represents buyers in Miami pre-construction.

A person replies within 24 hours, usually much sooner. On weekends, back on Monday morning.

WhatsApp the deskEmail the desk